107: Nutanix Weekly: Migration to AHV Brownfield Considerations

Juil 22, 2025

As far as analysts and customers were concerned, hypervisors within the datacenter were a very mature segment that had been on cruise control for the past decade.

VMware was a leader for most of the 21st century. However, during the past decade, Nutanix has been developing AHV to meet customer demand and has made steady and noteworthy progress.

Blog : https://www.nutanix.com/blog/migration-to-ahv-brownfield-considerations

Animateur : Phil Sellers, XenTegra
Co-animateur : Chris Calhoun, XenTegra
Co-Host: Andy Greene, XenTegra

Why Migrations Are on the Table

Many mid-market organizations are reassessing their virtualization platform after Broadcom acquired VMware, and any move to an alternative means migrating workloads. Rebuilding every virtual machine from scratch would take too much time and effort to be worthwhile, so tools matter. AHV has also matured steadily and recently marked its tenth anniversary. It is built on open-source KVM, which means software that supports KVM is generally supported on AHV.

The Nutanix blog on brownfield considerations covers two questions: how to move workloads, and what to do with the existing hardware.

Nutanix Move as the Easy Button

Nutanix Move is the main migration tool. It connects to vCenter with credentials, inventories the virtual machines, and syncs them to a target AHV cluster. It also handles Hyper-V, VMware Cloud workloads, and native AWS and Azure virtual machines, and a related capability covers file shares into Nutanix Files. The tools are available at no cost.

Replication jobs can be scheduled during the work week, so administrators do not need to work nights and weekends. The source machines keep running while copies sync in the background. Groups of virtual machines can be scheduled together, and cutovers happen in stages or phases. At cutover, Move powers off the source, replicates the last small set of changes, and powers on the AHV virtual machine, which is much like a high availability event. The network adapter on the source machine is disabled, so if a test fails, the AHV copy can be powered off and the original restored.

Planning matters. Workloads should be grouped with their dependencies, such as an application server, a database server, and a web server moved together, similar to a disaster recovery plan. A practical approach is to test with a development or test virtual machine first, including timing the cutover, so the team builds confidence before the real event. Nutanix Test Drive is a good way to see it in action.

Workloads That Need Special Handling

Most Windows and Linux virtual machines are routine. A few types deserve extra attention. Domain controllers are usually handled by standing up a new one, syncing it with Active Directory, and transferring the roles. Databases may be recovered through a third-party backup tool and redeployed onto a new virtual machine on Nutanix.

The workloads that require the most focus are those with a direct integration with VMware, such as appliances deployed as OVA or OVF files. The question is whether the vendor offers an AHV or KVM package. Many vendors now publish KVM-specific releases, and their documentation mentions other hypervisors. Even if the OVA cannot be migrated, the application can often be redeployed and its data moved over.

Reusing Existing Hardware

The blog describes two ways to extend existing investments. The first is support for vSAN ReadyNodes. Nutanix can now repurpose them by integrating them with Nutanix Cloud Infrastructure and AHV. This provides validation from Nutanix, which has always kept a tight hardware compatibility list, and it assures performance and longevity of the hardware. VxRail is not equivalent, since it is a different architecture. There is no direct path for it, though incentives exist.

The process uses Foundation, the tool that discovers nodes and builds a Nutanix cluster by installing the hypervisor and the Nutanix software. Because a cluster has to be wiped to be rebuilt, workloads first move somewhere else, such as a disaster recovery site or other VMware infrastructure. After the cluster is built, Move syncs the workloads back. A cluster can also be migrated incrementally, by freeing some nodes, starting the AHV cluster, and moving over node by node.

External Storage with Dell PowerFlex

Storage refresh cycles have often been the obstacle, since Nutanix has not traditionally supported external storage. That changed with support for Dell PowerFlex, which became generally available this year. In this model, Nutanix manages the compute and the Controller VM remains in place, so the platform’s simplicity stays. It is meant for customers who run compatible storage and want to replace vSphere but are not vSAN users. Support is validated by both Dell and Nutanix.